The operation and installation of taper shank twist drill

HSS Taper Shank Twist Drill  3
►changsha langfeng metallic material introduce the operation and installaation of taper shank twist drill,high speed twist drill bit .

(1). Determining the feed rate: Feed rate is generally depend on people&rsquo s experience, the value is general 0.08-0.12mm / rotation or 0.6-1.0mm / sec, feed speed is a more critical element in drilling, different amount feed can form different iron, different chip will change the performance of iron.
(2)Location: in order to ensure the accuracy of the drilling locations, you needs to hit a chisel drilling anchor point or draw a ” ten” line with alloy pin in a central location .Note that when you play with a center anchor point chisel, make sure the center of the chisel perpendicular on the surface of the workpiece, so as not to affect the discharge of cutting material cores.
(3)Start drilling: Please adjust the speed with a good shift, make sure the bottom of magnetic be clean, open magnetic switch and meanwhile open the motor switch, run the motor at the same time open the coolant switch, when the drill contact the steel, at first slowly feed, after drill about 1-2mm, then speed the feed normally.
(4)The end of drilling : turn off the motor shaft, determining the feed rat. Feed rate is generally depend on experience. In terms of the value, it&rsquo s generally 0.08-0.12mm / rotation or 0.6-1.0mm / sec, the feed rate is in comparison of key elements, different feed amount of iron can form different drilling, different chip will change the performance of iron.

Stay tuned for detailed product information company official website: http://www.langfengmetallic.com/

Be the first to comment on "The operation and installation of taper shank twist drill"

Leave a comment

Your email address will not be published.


*